Packaging Details
1) Steel structure components will be in nude packaging with proper protection.
2) Sandwich panels will be packed with plastic film.
3) Doors and windows will be packed with bubble plastic.
4) Bolts and other accessory will be packed in wood boxes.
Normally is 40'HQ and 40'OT container.
If you have specifical requirements,40GP and 20' container is ok.